Conditional Use: Transmission line upgrade from 138 kV to 230
What is it
CONDITIONAL USE
Active
Conditional Use: Transmission line upgrade from 138 kV to 230 · Ada County
Transmission line upgrade from 138 kV to 230 kV known as Mayfield Interconnect Transmission Line Project. To include replacing existing poles with new poles (Height of 70' to 110' depending on topography) to connect the Micron substation to the Mayfield substation in Elmore County.